标题: Lesson 64 The Channel Tunnel [打印本页] 作者: sweet_smile 时间: 2011-3-10 09:25 标题: Lesson 64 The Channel Tunnel
Try to improve your ability by making full use of the listening material.If you meet any difficulty,please answer this post to list your question,we will help you to solve it,let's study together.
In 1858, a French engineer, Aime Thome de Gamond, arrived in England with a plan for a twenty-one-mile tunnel under the English Channel. (1)___________________________. This platform would serve as a port and a railway station. The tunnel would be well-ventilated if tall chimneys were built above sea level. In 1860, a better plan was put forward by an Englishman, William Low. (2)__________________________. This would solve the problem of ventilation, for if a train entered this tunnel, it would draw in fresh air behind it. Forty-two years later a tunnel was actually begun. If, at the time, the British had not feared invasion, it would have been completed. The world had to wait almost another 100 years for the Channel Tunnel.(3)___________________________.
1)He said that it would be possible to build a platform in the center of the channel
2)He suggested that double railway tunnel should be built
3)It was a fishionly open down much 1994,finally clucting Briton to the year opinion company作者: missyouhuang 时间: 2011-4-27 08:20
He said that it would be possible to bulid a platform in the center of the Channel
He suggusted that a double railway tunnel should be bulit
It was officially opened on march 7th 1994 finally connecting Britain to the European continent